Dashboard
New
Audit Management
Beta
Audit NC & CAPA
Beta
Mgmt Of Change
New
Risk Assessment
Beta
Document Management
Q-Alert
12
Kaizen
Calibration
42
Customer Complaint
2
Supplier NC & CAPA
23
Supplier MTC
Inspection Mgmt
Beta
Serial VS Heat JCS
Mill Certificate JCS
Serial VS Heat JCVI
LOT serial ICP
Internal NC & CAPA
New
Incoming Inspection
New
Support Ticket
New
OHS Mgmt
New
*
FAI Report
Beta
Admin Settings
Employees
Roles
Plants
Product Groups
Departments
Suppliers
Customers
Standard Normative
Design Standard
Testing Standard
Special Testing Standard
Product Configuration
Model
Component
Product Type
Non Mandatory Components
QR Code Mapping
Basic Valve Parameters
Size
Bore
Class
Test Pressure
End Connection
Operator Type
Material Specification
Meeting
Coordinators
Categories
Venues
Risk & MoC
Impact Area
Process
Risk Source
Risk Type
MoC Type
Customer Management
Nature of Complaints
Sub Categories
Support Ticket
Status
Categories
Q-Alert
Action Category
Nature Of Observation
Area/Process
Audit
Audit Standard
Audit Area
Audit Coordinators
Kaizen
Category
Focus Area
Process
Kaizen Type
Valvulas
Valvulas
Features
Industries
Customer Email Content
You are not authorized to access this module
DQMS
(
)
Change Password
New Password
Confirm Password
Upload Logo
Select image for logo (Max: 1MB)
Image name has to be without space.
Home
»
Incoming Inspection
» Add FAI
Material Information
Type of Raw Material
Casting
Forged
1) General & Visual Checking
Check
OK
NOK
N/A
Material according requested
Quantity according requested
MTC according requested
Marking of material according PS04.I1 point 5.1
Visually aspect of the material (rust, dirt, hits, scratches, …)
Previous NCR open to supplier regarding same article
Packing of material done properly (*Attach pictures)
General photos of visual and dimensional checking
2) Dimension Control
Check
OK
NOK
N/A
Surface Finish
--External Surface
- Critical surface finish [ ≤ ]
Chamfers and removing of sharp edges
Dimensions checking according drawing
*Attach drawing with OK or NOK, next to dimension value. Should appear wrote in drawing: Dimensions checked, Purchase order number, quantity inspected and date
Drawing No
Selection
Actions
3) Body Checks
Checks
OK
NOK
N/A
Thickness of body’s wall
Position of holes (Flange’s holes and body-connector’s joint thread hole)
Fire safe chamfer checking (According PS04.I23 Rev.0)
Removing of sharping edge (Stem inside hole and O-rings housing)
Surface finish of sealing areas (O-rings slots and seat housing)
Stem’s hole position (Alignment stem hole with seats and connector axis’s center.)
Parallelism between faces (Flange face and connector’s joint face)
Status of raised face (RF) (Without hits, scratches, …)
Forged Trunnion, check stud’s threat depth of body-connector joint
Stop pin hole (Diameter and depth)
Seat slot height
Depth stem’s anti-blow
Perpendicularity between ISO plate and connector’s hole
4) Connector Checks
Checks
OK
NOK
N/A
Thickness of connector’s wall
Position of holes (Flange’s holes and body-connector’s joint hole)
Surface finish of sealing areas (Seat housing)
Status of raised face (RF) (Without hits, scratches, …)
Fire safe checking
Seat slot height
Position of key’s slot in Semi trunnion design
Body connection (OD spiral wound, serrated surface finish, …)
5) NON DESTRUCTIVE TEST (NDT)
Ultrasonic (UT)
Radiographic (RX)
Observation
Upload Attachments
Result
Accept
Repair
Reject
Magnetic test (MT)
Penetrant test (PT)
Observation
Upload Attachments
Result
Accept
Repair
Reject
6) Evaluation of Results
Observation
Accept
Repair
Reject
Add Control Dimensional
Dimension No
Nominal Size
Tolerance
M #1
M #2
M #3
M #4
M #5
M #6
M #7
M #8
M #9
M #10
Drawing Dimension Checking
Drawing No
OK
NOK
N/A
Excel Import
Add Drawing Specification
Drawing No
Selection
OK
NOK
N/A
Report Bug
Describe your issue / Request
Priority
High
Medium
Low
Screenshots(optional)